on 05-25-2010 10:31 AM
Hello, i have created a shipping point. however when i create the sales order i do not get any values in the matchcode.
Hi,
Can you please tell us what exactly is the error you are getting . Please be specific.
Hope that you have checked your settings for assigning shipping point to plant and that shipping point determination.
Regards,
Krishna O
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
When i click on the matchcode for shipping point, i get ' no possible values exist for this field'
when i compare the material i am currently using vs one already created in mm03 -> Sales: General/Plant Data
in one screen i have
Trans. Grp 0001 On pallets LoadingGrp ZDRG Crane
Setup time 0.00 Proc. time 0.00 Base qty 0 ST
in the other i only have
Setup time 0.00 Proc. time 0.00 Base qty 0 ST
the transport groups , loading groups are missing.
i found the cause. my material is of type 'service'. when i create the sales order with a material of type 'beverages' the shipping point is correctly determined. also, in my material master, i do not have the loading point option under General data/ site. I think this is normal since 'service' cannot be loaded (with a crane for example).
Then the link shipping condition / site / shipping point / loading group cannot be made since the loading group is not present in material master.
Hi,
In the shipping point determination maintain the settings by keeping loading group field blank and system will pick up the shipping point. If you required to get the Shipping point in sales order.
For Eg: SC-01/ loading group - blank/plant-001/Sh p-0001.
This will help you to resole your issue.
REgards,
Krishna O
User | Count |
---|---|
101 | |
14 | |
10 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.