on 03-07-2022 6:38 AM
Dear Experts,
Requesting your guidance to map the customer requirement as below.
Regards & Thanks in advance.
Theja
Hello,
Are you using Sample drawing procedure? if yes, then change your enhancement to consider the sample drawing procedure to make VMENGE05 Required/Optional. You know that in the sample drawing procedure you maintain Reserve sample for certain SDP and do not maintain in certain SDP. Then you assign the SDP to inspection plan for material. So, you can put the logic that if the SDP is with reserve sample then make the field mandatory and if not then make it optional. Take the SDP from QALS-PRBNAVERF and then check QPRVP to verify if the SDP is having reserved sample or not.
Dipesh.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
9 | |
7 | |
6 | |
6 | |
3 | |
3 | |
3 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.