cancel
Showing results for 
Search instead for 
Did you mean: 

How to post goods issue from project stock in outbound delivery from project stock

peter_langner
Active Contributor
0 Kudos

Dear all,

I want to post a goods issue from outbound delivery (OBD). I have available quantity in the project stock. I also entered the WBS number in the OBD.

But I get error M7 021 - Deficit of BA Unrestricted-use 2.000 KG : 2000006 5000 SIT 0000000035.

How to tell the system to use the project stock?

Best

Peter

View Entire Topic
Lakshmipathi
Active Contributor

Please carry out the below steps

  1. Check your item category whether it is set to Q against Special Stock field. I presume, it is blank currently and hence, not considering the project stock.
  2. Check the sale order what Requirement Type is flowing.
  3. Go to OVZH and check what Requirement Class is assigned to this Requirement Type.
  4. Go to OVZG and see which Requirement Class is set to "Q"
  5. Finally, you can assign this Requirement Class to your Requirement Type in OVZH

My preference would be to change the item category configuration to consider project stock and needless to say, you need to assign this item category to your sale order type in VOV4