Hi Gurus,

Usage indicator is ticked on Dynamic rules even if no sampling procedure uses this dynamic rule.

I checked with the where-used list.

So I can not delete it.

Is there a program to run or a tips to reset and to update this flag?

Many thanks.

Stéphane

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Nov 05, 2009 at 02:42 PM

    Hi

    DMR is not used in the sampling procedure.

    this is either used in the task list or in inspection setup.

    please check again whereused list for DMR or

    In order to reset the same go to tcode QDH2/3 & check against the DMR ,which materials are displayed

    QDH1 Q-level evaluation: Change data

    QDH2 Q-level evaluation: Display data

    also check

    QDL1 Create quality level

    QDL2 Change quality level

    QDL3 Display quality level

    Also check the

    QDB1 Maintain allowed relationships

    QDB3 Display allowed relationships

    where you maintain DMR with sampling procedure relation.

    Regards

    Sujit