cancel
Showing results for 
Search instead for 
Did you mean: 

Manual reorder point planning - orders to reorder point not maximum stock in some instances. Why?

Former Member
0 Kudos

MRP type = VB, Lot size = HB, reorder point = 176, max stock = 280, Min lot size = 1, rounding =1. All others left blank. MRP set at MRP area level. There are some external requirements. MD01/MD02 create PRs to stock of 176.

There are other similar materials. Other materials order correctly to max stock.

Any suggestions as to what may cause.

Accepted Solutions (0)

Answers (0)