Work Order Actual cost from Goods Movement are not reflected in Work Order

Former Member
0 Kudos

Goods Movement were posted on a work order with cost settlement configured at operation level. Material Documents were posted. PMCO_OP tables were updated with the figures. Some of the goods movement costs were reflected BUT some of the actual cost is not reflected in the work order operation and header level.

All the materials have MA Price.

I tried using OLI5 but it is not for PMCO_OP and could not find anything.

Kindly advise and share if you have this problem and resolution. THanks!

Accepted Solutions (0)

Answers (1)

Answers (1)

AntonH
Discoverer
0 Kudos

Try transaction OLI5N