Skip to Content
avatar image
Former Member

Is it possiable to separate backflush for reporting point in rem with a specific planned order?

Dear gurus,

I have set 3 reporting point in routing, and the rem manufacturing profile have been set RP confirmation and separated backflush. When I used MFBF without planned order, the goods issue process can be separated from the reporting point normally. But the message box(picture 3) popup in MFBF with planned order. Is it possiable to separate the backflushing process if I am carrying out a reporting point backflush for a specific planned order?

Best regards,

Hongda.

phztk.png (44.0 kB)
ynozp.png (33.7 kB)
elirs.png (62.5 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers