on 08-27-2013 7:26 PM
Hi all,
I would like to know if it is possible to generate the 08 inspection lot for a stock transfer between different plants (same material, batch,...) only if there isn't a 01 inspection lot with the UD taken and accepted in the initial plant linked to the batch. I supposed that it could be managed through configuration, but after check it I haven't found the correct way.
Thanks in advance,
Kind regards.
Hi
Can you explain your problem more precisely.
regards
Manish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Inspection lot can be generated if the material is being transferred from one plant to other plant if inspection type '08' is activated in the material.
I don't think inspection type '01' would affect it in any way. Once the batch is posted to unrestricted from QM after 01 inspection, further movement to other plant would create the 08 inspection lot.
All gurus kindly suugest !!
Kind Regards,
Hi Nitin
Are you doing stock transfer with the help of purchase order(STO). and if you want that lot must not created for doing MIGO if inspection type 08 is active in that plant. Then deactivate QM for below mentioned combination.
Then lot will not be created for 101 movement type in case of stock transfer.
regards
Manish
Hi Manish. Thanks for responding. Basically we have adopted the scenario of interplant transfer through SO-PO route and accrodingly MIGO is being done.
Yes, we have also controlled the Quality inspection for goods movements. This way we are able to avoid inspection lots for 08 type during MIGO.
But I need to know one more thing, also said in my earlier response, I'll put it in simple words,
1. Insp type 08 is activated for a material.
2. There is no SO-PO scenario between the plants, lets say from P1 to P2.
3. No other setting is maintained and I have not deactivated the QA inspection for a movement type.
Now if I transfer the material from P1 to P2 and do the MIGO, would inspection lot not be generated? Would there be any impact if the inspection type 01 is also activated in P1??
As there is no relation between GR (101) movement & stock transfer, I feel its not possible in standard.
Even with Custom development, it will not be achievable. Because, you may receive 100 qty. In stock, already, some 200 qty may be available. Out of 300, you may transfer 70 qty. How do you know which qty (From received lot i.e., 100 or In hand stock i.e., 200) you are going to transfer.
Also, if you have made 01 inspection type, then all qty should be checked in Quality before moving to unrestricted stock. So, no qty requires 08 inspection type.
I hope, I have understood your question correctly & answered appropriately. If not, please make me to understand your query again.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
14 | |
10 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.