Hi,We use BAPI_PRODORDCONF_CREATE_TT within Z*report for production order confirmation instead of CO11N.We constantly have entries in CO16N like:"Order 123 is already being processed by user A". or "Reservation XXX is already being processed".But it...
HiI have a few levels BOM. Structure is followingRequirement is: I need different way of BOM selection during creating Planned order:1. If I use BOM1 for Material A, than on lower level BOM1 should be chosen for material B2. If I use BOM2 for Materia...
Hi,When I open CO09 I see this picture:DateMRP elementMRP element dataReq.reqd qtyConfirmedCumulative ATP qty09.02.2024Stock 300016.10.2023DelvryTotals record12-12016.10.2023Delvry00111111/000010/00008-8016.10.2...
Hi
We have production with PIR and Sales orders. Our Strategy is 40. In certain way it works ok.
Scenario 1: PIR = 1000, Sales order = 700. After MRP run Planned order = 1000. - it's ok for us.
Scenario 2: PIR = 1000, Sales order = 1200. After...
Hi,
There is a table PTRV_HEAD. It contains Trip data. But there is no field "Created by". It has only "Changed by" but it doesn't suit. Other tables I found also doesn't have "Created by".
I need to see all travels, which were created by particu...
Hi Robert,Yes, you are right - job CORUPROC are in use. Now it makes sense why we have locking entries in CO16N. Thanks.So now we need to avoid stuck entries in CO1P, when user confirm order in Z* program.You suggest to use BAPI ENQUEUE_READ to retur...
Moreover, strategy 10 ignores Sales order. But we need that Sales orders considered but consuming by PIR as it works in strategy 40. Because for each Sales order we receive Planned order considered Sales order dates.