Hi ,
Before going to Go-live what are the Best Practise according to SAP which need to be done?
Kindly Suggest !!!!!
Regards
Adil
Hi Adil,
Please check the following from basis perspective
1) Production is installed
2) All the required patches have been applied
3) Backup has been configured and tested
4) If having HA, it is configured and tested
5) Pre-Golive session has been completed by SAP
6) Post Go-live session scheduled by SAP
7) User master and authorization has been completed
😎 All the necessary monitoring has been enabled through solution manager
9) EWA configured and operational.
Hope this helps.
Regards,
Deepak Kori
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
78 | |
9 | |
9 | |
7 | |
7 | |
6 | |
6 | |
5 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.