cancel
Showing results for 
Search instead for 
Did you mean: 

Loading several Infopackages to same cube

Former Member
0 Kudos

Hi,

I'm trying to load 4 year's data, which is split into 4 Infopackages to the same ODS and then to an Infocube. Can I schedule all infopackages at the same time , or do I have to do it sequentially?

Thanks

Riya

View Entire Topic
Former Member
0 Kudos

Do it sequentially to avoid locking errors.

Ravi Thothadri