cancel
Showing results for 
Search instead for 
Did you mean: 

doubt in reporting

Former Member
0 Kudos

I have a reporting requirement in which I have to calculate the number of days. The requirement is something like this:

A person receives his promotion on 01/20/2006 so when user pulls the report he wants to see how long that person has been in that position which means I will have to take the current date and then do subtract with the promotion date (System date - promotion date). The dilemma here is that the promotion date is listed as a characteristic and I can't include it in my calculated keyfigure. Please help.

Thanks,

swathi.

View Entire Topic
Former Member
0 Kudos

Hi swathi,

refer this step by step guide:

[http://www.sd-solutions.com/documents/SDS_BW_Replacement%20Path%20Variables.html]

In the example above, replace Valid from with calday and restrict it to the SAP exit variable current calendar day and replace Valid to with your promotion day

regards,

NR