on 03-14-2019 2:25 PM
Promotion Management job in 4.1 to 4.2 is causing Date Formats in input prompts to change from mm/dd/yy to mon/dd/yy this is causing error in BI Launchpad only. We are promoting Crystal rpt files and do not know why CMC is different from BI Launchpad.
After I open it in local Crystal designer, and save it back in the repository, it behaves fine. But when promoted to QA server, it is reverting to mon/dd/yy format and throwing an error at input itself. How do we get around this?
Which service pack of 4.2 are you promoting to and has it been patched? I seem to recall this being an issue at one point that was fixed by a patch but I don't remember the details.
-Dell
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I think I recall that this issue did occur with the base install of 4.2 SP4. Each patch is cumulative (containing all of the previous patches) so I would just install the latest one which, for 4.2 SP4 is patch 13.
-Dell
User | Count |
---|---|
76 | |
9 | |
8 | |
7 | |
6 | |
5 | |
5 | |
5 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.