cancel
Showing results for 
Search instead for 
Did you mean: 

Splitting WO for PI-RF count

0 Kudos

As a PI-area can only be assigned to one AA, I followed SAP and created 0001 as the activty area where all stockholding storage types (involved in the PI-count) are to be linked to.

So I created a sorting sequence via /scwm/V_TAAREAS (for activity INVE and activtyarea 0001 ) and /V_TAAREAD (for activityarea 0001) so that all countable bins do appear in the proper sequence in /scwm/SBST, for activity INVE/activity area 0001.

You might consider this overdone at first hand, but we intend to provide a WO-print (with limited info) to the RF operator so he can scan his own WO during the anual PI count. Therefore we do require multiple WO's, so that each RF-user can select his own task by simply scanning the submitted document. Differentiation in Queue assignment is therefore not meaning full. Having thus no further option to splitt the WO; I introduced a consolidation group representing a group of bins which one RF-operator can sequentially count. (done via /scwm/V_TAAREAD)

Accordingly I created a limit-rule where I specified that only 1 Consolidation group was allowed by WO. This limit rule was applied in a WOCR which is nicely applied during WO creation during creation/saving of the PI document.

However it still gives me only one WO instead of multiple WO's as per the different consolidation groups all belonging to activity area 0001.

Although SAP SPRO helps indicates that this should be possible; I fear this only works during picking (where the source and destination bin are different). Am I here on the correct path? Does anybody recognize this issue and may be somebody found a solution around this? Any suggestion is appreciated.

Best regards

Maarten

View Entire Topic
former_member209095
Contributor
0 Kudos

Hi,


I followed SAP and created 0001 as the activty area where all stockholding storage types (involved in the PI-count) are to be linked to.

This is a suggestion, not a restriction. You can multiply physical inventory area depending on activity area. Just sayin..


I introduced a consolidation group representing a group of bins which one RF-operator can sequentially count.

So you want to create WHO depending on a number of bins? If this bin number is standard for all users, you can create a copy from limit MX01 or maybe use MX10? If this does not fit, then you can use one of the BAdI's.

Best regards

Serhan

0 Kudos

Indeed; I thought of one PI-area being the warehouse (where all the same rules applies), but indeed it compromise a number of locations. So I will create several PI-areas and assign those to AAs used for INVE. This should work as now I can have different AA's which should give me different WO's per AA. Thanks!