Dear All,
Generally, we follow the following procedure....In the month begining, we generate the baseline forecast for all the locations (we are having around 20 branches). Then we used to open the DP planning book for a couple of days to our branch persons so that they are able to feed their correction. After which we release the final forecast i.e. Baseline Forecast +/- Branch correction to SNP for further proceesing.
This month, we opened the planning book (as usual). Branches did the branch correction. But on final checking, we found that around 4 - 5 branches have done corrections / updations very vagely i.e. roughly. So, we wants to ignore their branch correction.
My query be that is it possible that while releasing the Forecast from DP to SNP... can we release baseline forecast for selective five branches and for the rest of the branches, we wants to release final forecast key figure i.e. Baseline +/- Branch correction.
Kindly advise further.
With Best Regards,
Sanjeev Chugh
17-NOV-2010 (AN)
Sanjeev
You have not mentioned at what level you are doing the forecasting. If forecasting is done at material- branch level then what you are asking can be achieved easily. All you have to do is go to /n/sapapo/mc90 ( or create a release profile) and for the branches for which you want to release baseline forecast , you have to specify the baseline forecast keyfigure in the input and specify the material branches in the i/p criteria. For adjusted forecast you have to use another variant and specify the adjusted forecast key figure and the corresponding material branches.
Iam not sure how your requirement can be achieved in case you are forecasting @ material level.
Thanks
Aparna
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.