on 08-05-2013 8:00 PM
Hello,
I am customizing a multiple allocation procedure, that has 3 allocation procedures checks. And I want to avoid the following situation:
A sales order require 100 crt for product xxxzzz
Result: 100 crt confirmed
Procedure 1: no confirmation
Procedure 2: partial confirmation (50 crt )
Procedure 3: partial confirmarion (50 crt )
I want the following result:
Expected result: 50 crt confirmed
Procedure 1 no confirmation
Procedure 2: partial confirmation (50 crt )
Procedure 3: no check or no confirmation
What I am expecting is to have an "OR" condition (procedure 1 "or" procedure 2 "or" procedure 3).
Is it possible?
Thank you.
Hello Al,
As per my understanding, Product Allocation procedure sequence doesn't allow OR condition the way you explained.
Although Business requirement is not clear. So I will suggest to reevaluate your business requirement. Because the scenario which you explained above may be caused by technical settings/configurations exist in your current system.
But if any of the Business requirement does not fit into your current solution. You may like to reconfigure Product Allocation Group with desired Characteristics and then setting up Allocation procedure for the same.
Thank you
Satish Waghmare
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
4 | |
3 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.