cancel
Showing results for 
Search instead for 
Did you mean: 

3 Step Picking

former_member183155
Active Contributor
0 Kudos

Hi all ,

I have a pickingg scenerio such a given below.

I have high ruck storage type contains pallets.

Firstly , i will pick pallets to 9050 storage type that is located in end of corridors 0050.

Secondly , i will transfer pallets to 9045 storage type that is located near of doors. This is my second WT that will be automatically.

Thirdly , i will load pallets to track that is 9040 storage type used for loading.

Actually, i configurated pick and load ( 9050-->9040) but customer wants a more wt to transfer pallets near to doors.

I hope that posc has to give a solution but i did not achieve this 🙂

Could you check configurations ? If you have any other idea , share it.

Juergen Pitz , any idea ? Layout oriented might be used ?

However, 9050 storage type contains OB04 external step.

Brgds

M.Ozgur Unal

View Entire Topic
sushant_wanjari
Contributor

Hi,

I suggest you have LOSC in association of POSC to achieve what you want.

Keep the first step of POSC for OB01 with destination as 9045. For this movement define an LOSC for High Rack -> 9050 and 9050 -> 9045.

Once the pallet reaches 9045, define OB03 (for staging) and OB04 - for loading.

I assume you are not doing the packing step hence OB02 is skipped.

regards,

Sushant