Origin of estimation Field in REABLD

Former Member
0 Kudos

Hi Experts ,

I am trying to enter meter result for a device in EL28.

When I click on estimate button , I get information message EL185 that estimation could not determine valid MR.

Also, If we enter very high MR so that it is implausible , the validations are not performed because expected consumption is not determined.

In that case it gives message independent validations are not possible - EL 348.

Again the cause is expected consumption is not determined.

I checked in debugging , there I found that in the initail screen of EL28 , when we enter device/installation , the REABLD-ORIGIN_ESTIM value gets filled with value 06 .

That is , estimations are not possible.

Domain - ORIGIN_ESTIM.

Does anybody know why this field gets 06 ?

What are possible reasons ? Can you explain it functionally ?

Thanks in advance.

Regards,

Nachiket

4 REPLIES 4

Former Member
0 Kudos

Hello Nachiket,

Check the below possibility.

You are doing EL28 for a certain MR date, check if any previous MR date (may be a Move-in MR) is still pending for MR or not.

If such a case then please enter MR for the previous dates and then next.

Regards

Sachin

0 Kudos

Hi Sachin ,

Thanks for your reply.

I checked but there is no previous pending MR.

There was device replacement done on that installation.

Thanks,

Nachiket

0 Kudos

Hi Nachiket,

Generally the error generated when the previous MR is abnormal.

Can you once have a check on your Validations in SPRO.

You mentioned there was device change, please check if any data inconsistecy is still remaining there.

Regards

Sachin

Mantovas
Participant
0 Kudos

Hi Nachiket,

Try EL27 to check if there is any blocked readings. If not, try EL30 to estimate the MR.

RM.