04-23-2010 12:55 PM
hi all,
In my case, At installation level one flag is active, this flag is basically a service which BP opt at the time of move-in, once the BP left that premise (means Move-out) than this flag should automatically become incative. but this thing is not happening here.
Suggest me what to do.
04-23-2010 1:54 PM
Hi,
Check whether the meter readings order are open before Move Out...if they aare open ...Ente Meter Readig results to those Orders...check the status after entering results..
Regards,
Narendar Konakanchi
04-24-2010 10:12 AM
did the move-out connect the final billing ?
if so ,the failure of the final billing may be the reason.