Help required on the Unbilled Simulation with TOU Interface.

0 Kudos

Hello Experts,

We have performing the Unbilled simulation with TOU Interface. As a prerequisite, the periodic consumption we need to provide at register level as a fixed value in the installation structure data. if we are not Maintain this periodic consumption, then we are facing an error No annual consumption available for profile Synthetic profile.

If i maintain the periodic consumption , i am able to simulate using ea00, EAMS00 & EAMS01. Is there any possibilities can we perform simulations (EA00, EAMS00 & EAMS01) with out maintaining the period consumption.

0 REPLIES 0