SAP for Retail Blogs
Gain insights and practical tips to captivate customers, optimize your supply chain, and drive growth with SAP for Retail software. Share your own insights!
cancel
Showing results for 
Search instead for 
Did you mean: 
Abhishek_Singh5
Participant

Shipping and Receiving 

Shipping and receiving is a warehouse process for loading/ Unloading of outbound & and inbound deliveries. This involves the use of transportation units with delivery numbers assigned. We will see in this blog all basic configurations needed in ERP and EWM to perform the Inbound Process with TU arrival at the Door àUnloading to Good Receipt Area à Final Putaway to final Bin.

Begin configuration in ERP

Goto: SPRO – IMG – Logistic General – Handling Unit Management – Basics 

abhishek_sap2008_0-1707980272373.png

Define Packing Material 

abhishek_sap2008_1-1707980272381.png

Define Packing Material Group 

abhishek_sap2008_2-1707980272384.png

Define allowed Pack Material type per Material Group 

abhishek_sap2008_3-1707980272388.png

Create Packing Material using MM01 

abhishek_sap2008_4-1707980272393.png

Maintain in Sales: General/Plant view Pack Mat type and Group

abhishek_sap2008_5-1707980272399.png

Do the EWM Configuration

abhishek_sap2008_6-1707980272407.png

Activate shipping and Receiving for the warehouse 

abhishek_sap2008_7-1707980272410.png

Check - General settings for shipping and Receiving 

abhishek_sap2008_8-1707980272417.png

Maintain Control Parameters for TU 

abhishek_sap2008_9-1707980272421.png

Now it’s time to maintain the same packing Material under the Handling Unit.

abhishek_sap2008_10-1707980272425.png

Go to SPRO – IMG - SCM EWM – EWM – Cross process Settings – Handling Units – Basics   

We will be defining – 

  1. Pack mat type,
  2. Pack Mat Grp and
  3. Allowed packing Mat type for Packing Grp. 

Define Packing Material Types in EWM

abhishek_sap2008_11-1707980272430.png

Define Packing Mat Group 

abhishek_sap2008_12-1707980272432.png

Maintain Allowed packing Mat type for Packing Grp. 

abhishek_sap2008_13-1707980272436.png

PPF Configurations 

SPRO - IMG – SCM EWM – EWM – Cross Process Settings – Shipping and Receiving – Message Processing – Define Action Profiles for TU 

abhishek_sap2008_14-1707980272455.png

SPRO - IMG – SCM EWM – EWM – Cross Process Settings – Shipping and Receiving – Message Processing – Define Action Conditions for TU 

abhishek_sap2008_15-1707980272492.png

Now, it’s time to create Inbound and Outbound Doors with Bins. 

Create Inbound Door Storage Type with Role “F”

abhishek_sap2008_16-1707980272534.png

Similarly Create a storage type - Outbound Door with Role F. 

abhishek_sap2008_17-1707980272536.png

Create Storage Sections for the Door

abhishek_sap2008_18-1707980272538.png

Create Bins for Doors

abhishek_sap2008_19-1707980272542.png

abhishek_sap2008_20-1707980272547.png

SPRO – IMG - SCM EWM – EWM – Master Data – Warehouse Door 

Define Warehouse Doors and Assign NR to Shipping and Receiving no

abhishek_sap2008_21-1707980272550.png

abhishek_sap2008_22-1707980272561.png

Goto Tcode - /SCWM/PM_MTR

Maintain the MTr, Pack Material 

abhishek_sap2008_23-1707980272567.png

Goto Tcode - /SCWM/DOOR_SCU

Maintain Door and bins with Supply chain Unit

abhishek_sap2008_24-1707980272584.png

Check the WPT source St type and bin.

We will be using POSC with 2 steps

Step 1: UNLD – from Source as TU to GR Bin

Step 2; PTWY – From Source as GR Bin to Final Bin 

Goto

SPRO – IMG - SCM EWM – EWM – Cross Process settings – Warehouse Task – Define WPT

abhishek_sap2008_25-1707980272599.png

SPRO – IMG - SCM EWM – EWM – Cross Process settings – Warehouse Task – Define POSC 

abhishek_sap2008_26-1707980272607.png

abhishek_sap2008_27-1707980272612.png

Now Create and distribute Inbound delivery into EWM. 

Note: I have packed the Material in a carton in VL31N before distributing to EWM

Goto /N/SCWM/TU and hit the Create new TU button. 

abhishek_sap2008_28-1707980272620.png

Follow the steps and assign the delivery number distributed.

TU Status will be “Planned”

abhishek_sap2008_29-1707980272629.png

And execute, 1 PDI document is assigned now under assigned delivery View

abhishek_sap2008_30-1707980272642.png

Now Goto Actions – Arrival at Door 

abhishek_sap2008_31-1707980272646.png

Validate the Inbound Door from the assigned doors view tab

abhishek_sap2008_32-1707980272650.png

TU status should be – “Active”.
Hit Save.

In the Next step, after TU arrives at Door, create WT

abhishek_sap2008_33-1707980272654.png

The system will now create 2 Warehouse tasks -
UNLD warehouse task should be open

and PTWY warehouse task will be with status “B” as waiting.
Confirm both the tasks.

abhishek_sap2008_34-1707980272657.png

The same came validated in TU Load/Unload status (This is Inbound – Unload status is completed).

abhishek_sap2008_35-1707980272661.png

And then finally after Putaway WT is complete and confirmed. 

abhishek_sap2008_36-1707980272663.png

Then perform Departure from Door.

abhishek_sap2008_37-1707980272669.pngPlease note:

If you don’t want to create the TU manually in EWM, then we should assign the TU at the time of IBD creation in the ERP system. 

abhishek_sap2008_38-1707980272688.png

Thank you!

Top kudoed authors