on 08-25-2008 4:10 PM
Hi,
We have wizards to generate intrastat reporting in ECC. but, I want to use SAP GTS ECR(Electronic Compliance Reporting) for instrastat reporting.
Can anybody guide as what are the configs needs to be done in ECC to make GTS ECR work, I headr that we need to configure extractors in ECC side.
Any guidance please
Thanks,
Hi Kiran,
Some of the steps required for Automated System are
A. Setup the Legal Regulation
B. Define the Determination Procedure
C. Assign Determination Procedure to a Service
D. Assign access to the Determination Procedure
E. Activate Legal Regulation
F. Foreign Trade Organization and Legal Unit
G. Create a Legal Unit
H. Assign company code to foreign trade organization
I. Assign legal unit to foreign trade organization
J. Assign plant from feeder system to Legal Unit
K. Create Schema for Electronic Messages
L. Check Electronic Message
M. Define PPF action
N. Define message for communication process
O. Message Determination
P. Legal Regulation: Customs Management Service Control
Q. Set up process flow for customs processing with AES
R. Customs Code List
S. Partner
T. Document
U. Maintain the determination Table for messages
V. Setup communication process
Thanks,
Prarit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I need to explore further
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
12 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.