cancel
Showing results for 
Search instead for 
Did you mean: 

ZNP1 Processing

former_member622494
Participant
0 Kudos

Hi ,

How to change an existing logic/ calculation which will not effect the earlier calculation .

For example : Earlier salary was deducting based on working hours 8 and new logic will be 8.5 .

If i change 8 to 8.5 ,it will deduct 0.5 hours more from retro .

Please throw some lights.

Thanks

Revati

Accepted Solutions (0)

Answers (1)

Answers (1)

BalaAP
Active Contributor

Hi, Copy ZNP1 to ZNP2. Keep 8 hrs logic in ZNP1 and 8.5 hours logic in ZNP2.

u may have to create a constant in T511K and have date validity with 2 different values. In a PCR, compare this constant value. Based on this value, call two versions of ZNP1 and ZNP2. ( one with 8 and another with 8.5 logic).