on 04-15-2012 9:34 AM
Dear All,
In material master record, in basic data 1 view there is X plant material status tick. After clicking F4 on same it gives the options as "01-Block for procurement" and "BP-Block for purchasing". Can any one please explain the difference between these two.
In both the cases it is not allowing me create the PR & PO.
Regards,
Hi,
Is Blocking Key assigned to material master in basic data 1 view in X plant material status, if yes, remove blocking key and create PR & PO. Or check source list(ME01) is material blocked for procurement, if yes, remove it and save .Now go for creation of PR & PO of material.
The blocking keys(01-Block for procurement" and "BP-Block for purchasing), as you have, the
code and description may be different but properties are same and both are cause for same purpose which is not allowing you to creates PR & PO as procurement and purchasing both looks very much similar word as designed by your consultant!
You can find out both keys ( 01 and BP) details in following path , where Purchasing segment set B in field of. Purchasing msg.
SPRO > Logistics -General > Material Master > Settings for Key Fields > Define Material Statuses
Now as needed/required by you remove the Blocking Key 01 or BP and try to create PR & PO! So you are able to create PR & PO
NOTE:
But insetad of blocking procurement by using blocking keys, you can use source list(ME01) for creation of PR & PO of material.
Regards,
Biju K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
8 | |
8 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.