cancel
Showing results for 
Search instead for 
Did you mean: 

Transfer Plant To Plant In Same Storage Bin WM

Former Member
0 Kudos

Hi Experts,

In our warehouse, we have different plants connected to same warehouse, but each plant stock is managed in same storage types as below.

Plant SLoc WH Storage Type Bin

1000 LOC1 001 001 01-01-01

1001 LOC1 001 001 01-01-01

In this scenario, users want to transfer stock from Plant to Plant directly in same storage bin WM.

Request your inputs on how this can be configured.

Thank you

View Entire Topic
MANIS
Active Contributor
0 Kudos

As far as configuration is concern you can find the setting under below mentioned node

IMG----LE---WM---INTERFACE---INVENTORY----Define Movement type---LE WM INTERFACE TO INVENTORY MANAGMENT

Why Posting change notice(PCN) - if you make any change in the quant characteristic (Storage Location / Plant / Batch/ Material / Special stock / stock category) system create PCN. in your case you want to change the plant hence you have to adopt the PCN route

You have to complete the task in two step (First perform the task in Inventory management using T-CODE : MIGO_TR and then perform the subsequenct activity in WM)

Step 1 ) MIGO_tR (MvT : 309) - As a result of MIGO_TR, system create material document and internally the Posting change notice

Step 2) use LT06 enter the Material document which will internally call t-code LT05 - Create TO agains the PCN

PCN is a logical movement in system only and no physical movement is required

Specify the Storage bin which stock you want to convert (This is only logical transfer in the system and no physical movement required )