hi i am working on reorder point scenarion

but dont know which values are necessary to put in MRP views and forcast views.

also when i run MRP i can see only the fg material.

if using reorder point i wish to see the all material requirement in bom list.

please suggest.

View Entire Topic
rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

The key MRP parameters are the MRP Type and Lot Size.

Use standard SAP MRP type = V1 and Lot size = HB

For V1 (Manual reord.point w. ext.reqs

) a re-order point must be spesified, make ROP = 100.

For HB (Replenish to maximum stock level) a maximum level must be spesified, make Max value = 1000.

Step 2 -- View current stock on hand.

For this you can use Stock Requirement List (MD04)

Make sure that your ROP is higher than your current stock on hand, otherwise MRP willl not create any documents. In this case Stock on hand (20) < ROP (100), so MRP will suggest you purchase stock.

Step 3 -- Lets run MRP.

Do a single item run. Use transaction MD02 (Single Item, Multi Level MRP run). The Single Item means for one material only. Multi Level refer to all levels of Bill of Material (BOM). This is not relevant in our example.

Step 4 -- Lets evaluate results of MRP run.

Configuration related to MRP

As mentioned -- main MRP parameters are MRP type and Lot Size.

Configuration for MRP Type.

IMG Menu: MM > Consumption Based Planning > Master Data > Check MRP Type

Please refer this also

[Reorder point steps|https://forums.sdn.sap.com/click.jspa?searchID=17578279&messageID=5931811]

Regards,

R.Brahmankar