cancel
Showing results for 
Search instead for 
Did you mean: 

How to reverse a Cost Centre PO in a HUM plant

former_member198492
Contributor
0 Kudos

Hi All

Can someone please explain the t-code to use to reverse a vendor PO with account assignment K in a HUM plant but with a non-HUM storage location?

We use VL31N to create the IBD and then VL32N to PGI.

There are no packing instructions for the material so no HU is created.

I cannot use VL09 as it states WM does not allow it. If I use MBRL or MBST the IBD is not updated.

We have the same issue when reversing vendor POs with account assignment P also

Regards

View Entire Topic
former_member684099
Discoverer
0 Kudos

Hi Darren

Try to use LT0G with movement type 999.