Hi all!

We are currently using the QM module in our SAP ERP 2005 installation. At master data level, we have been using inspection plans for several years.

Now we are considering maintaining the master data of the inspection plans directly in the master reciepes (PP), cause this would give us a better integration between QM and PP.

Our master reciepes group several materials wich have the same PP operations, and when I assign inpection chars to such operations, I'm not able to modify the selection set or tolerance values at material level (that is different values for each material contained in one master reciepe). I know that this data is maintained at master reciepe level, that is, the same for every material contained in it, but, the question is:

Is there any way to keep maintaining the selection sets or tolerance values independly for each material ? (basically like in the inspection plans ?)

Is anybody working in such scenario ?

I don't know if I've been clear enough.

Thanks in advance.

Ernest.

View Entire Topic
Former Member
0 Kudos

Hi

Has it been solved Or let me know.

Regards

YMREDDY