on 10-18-2008 5:14 PM
while the system was showing the problem of posting period problem(posting period was defined between sep 2008 to oct 2008 but system was not accepting the posting period. it is sollved after defining that period in ob52.
when posting(migo) is done ,it should have been done without any error.but the system is showing the error as:for object
RF_BELEG 1000,number range interval 50 does not exist FBN1.how to solve the issue.
hi
got ot FBN1
here select ur co code
then click on intervals button
then click on insert
here insert the interval as follows
50 2008 5000000 5099999
hope it helps
regards
kunal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
12 | |
10 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.