Hi experts,
I am trying to configure a BOM cost wherein on the sum total of the value of all the components, i need to charge manufacturing expenses as a percentage basis on the entire sum total.
Say item1 value is 100.00 and item2 value is 50.00 in a BOM, the total component cost is 150.00. Now i need to charge say 12% on 150.00 to arrive at my total product cost.
Can anyone tell me how do i do this?
Thanks & Regards,
Rahul
Is this a Production type BOM?
Adding overhead of 12% dynamically might not be possible within the out of the box capabilities of SAP B1. You might need a small customization.
If possible explain your scenario is different.
Regards
Suda
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
109 | |
15 | |
10 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.