Hi everyone,
I have two materials both are without a strategy group on the MRP3 tab in the material management.
On the first material I can created planned independent requirement using MD61 while on the second material I get an error saying that a strategy group is not present.
How is it possible to create planned independent requirement on the first material when there is no strategy group? Is it possible to define the strategy group for a material elsewhere?
The root cause of the issue was that the user normally loads the PIR with a program where it sets a requirement type. This requirement type points towards a requirements class which specifies the planning strategy and this is how the other materials usually found it.
The solution was to have the user specify the requirement type in MD61 in settings and user parameters.
Thank you for all the answers.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.