Hi Guys,
When we create Process order at the time of drum filling(Final stage), where FG is based on Pack size, SFG(i.e. Oil) is inside the Drum.
BOM Structure:
Drum is Header mat.
Oil is Item.
I need to generate Quality Inspection for Inside SFG (At the time of GR against Process order).
How it achieve?
Please suggest me....
IS QM Module is implemented
IF yes
activated the inspection type 04 in material master in Quality management view
Create a Inspection plan in QP01 with usage as 5 and status as relased
IN opration enter the description and click inspection characteristics
and assign MIC and sampling procedure