Engineering BOM is not exploding while running the MRP. I maintained the BOM usage 6

SharathML
Explorer
0 Kudos

Hi all,

While running the MRP for BOM (BOM usage 6 Engineering/design) BOM is not exploding and I get an error msg when I run the Cost estimate BOM 00000076 /alt. 1 /usage 6 has no items relevant to costing.

Kindly suggest solution for this. 

Accepted Solutions (1)

Accepted Solutions (1)

arjuna_bandara
Participant

HI,

To give you an idea of this standard behavior, 

For each BOM usages, you can define default values for BOM item statuses in configuration, such as costing relevancy and production relevancy.

arjuna_bandara_0-1708015505011.png

which will get defaulted/copied when you create the BOM.

arjuna_bandara_1-1708015885743.png

you can change this defaults (production relevancy, costing relevancy) at the BOM component level (CS02) if required, or select appropriate BOM usage when creating BOM.

 

 

Answers (1)

Answers (1)

Dsk
Active Contributor
0 Kudos

Hi only production bom will be used for MRP run and the costing. Can you convert your engineering BOm to the Production bom and then try.

Br,dsk