on 03-24-2010 1:07 PM
i have same group of cost element with mulitpile ptoduct
but diffreent overhead to individual product
how to map the scenarion in cost sheet.
Hi,
Looks like you expect to calculate OH based on Material. Well, there is no option to select 'Material' field as a dependency, however, you can include 'Overhead key' as one of the depenency (eg: 'D010') and assign Overhead key to Overhead group. Overhead group in turn can be assigned in Material master Costing view. In other words, you need to maintain as many Overhead keys & Overhead groups as there are number of Materials (one-one relation).
Hope this is what you are looking for.