cancel
Showing results for 
Search instead for 
Did you mean: 

Back ground lot generation.

Former Member
0 Kudos

Hello SAP Guru,

If material retest date & material expiry date is same for the batch & we are generating lot by backgroud process QA07 then what will happe whether material go in Block stock or generate recurring inspection lot?

Regards,

View Entire Topic
former_member42743
Active Contributor
0 Kudos

If the batch expiration date and the next inspection date are the same, and you run the QA07 program once, the material will go to blocked stock and no inspection lot will ever be generated.

This is because the QA07 is a two part program. The blocking part runs first. The inspection lot creation runs second. Since the material moves to blocked stock, when the inspection lot section runs, it does not see it as the program does not consider blocked stock.

To resolve the issue run QA07 twice. Once with just the inspection lot creation parameters set. This will then create the inspection lots.

Run it a second time with only the blocking parameters set.

FF