06-16-2008 10:18 AM
Hi everyone,
I am using the fm BAPI_PO_CREATE1 to create my PO's. The problem is, I keep getting the following error messages:
Purchase order item 00100 still contains faulty schedule lines
Delivery date is in the past
Can delivery date be met? (Realistic delivery date: 17.06.2008)
Deliv. date outside period covered by logistics calendar CH
I populate the delivery date like this:
wa_poschedule-po_item = wa_poitem-po_item.
v_date = SY-DATUM.
PERFORM convert_date USING v_date
CHANGING wa_poschedule-delivery_date.
wa_poschedule-sched_line = '0001'.
APPEND wa_poschedule TO i_poschedule.
wa_poschedulex-po_item = wa_poitem-po_item.
wa_poschedulex-po_itemx = 'X'.
wa_poschedulex-delivery_date = 'X'.
wa_poschedulex-sched_line = '0001'.
wa_poschedulex-sched_linex = 'X'.
APPEND wa_poschedulex TO i_poschedulex.
Does anyone have any idea what I am might be doing wrong?
Thanks
06-16-2008 10:19 AM
06-16-2008 10:22 AM