10-23-2006 5:05 PM
How is the planned data loaded into COPA to check against the actual data for an operating concern. Is there any transaction or can be use the system generated FM for the operating concern.
Thanks
Kshamatha
10-24-2006 1:52 PM
Just in case if anybody is looking for a solution. Planning layout (t-code KE11) is used to load the planned data.
Any other solutions please let me know.
Thanks
Kshamatha