on 09-01-2008 12:27 PM
Hi all,
Does there exist a way to load and modify master data using input schedules?
Regards,
Nithya
Hi Nithyapriya,
Chiming in here to 2nd Joost's statement above. As of BPC 5.1 version, it is not possible to update master data from an Input schedule.
Whether that's possible in other products or with BPC 7.0 NW (currently in Ramp-up), is another story. For now, the general answer is that it's not possible.
This is a known area for improvement with BPC at this time, and we're sure to hear more about either integration with NetWeaver or some other methods of making things more dynamic, or with SSIS packages, etc.. in the future.
Edited by: garrett tedeman on Sep 2, 2008 7:20 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.