KP26 Price caculated by system is different for periods

neeraj_bhardwaj4
Contributor
0 Kudos

Hi All

I have encountered a strange issue. I calculate KP26 price via SAP system after following below steps:

KP06 - cost center/cost element planning

KP26 - Manually input the Quantities

KSUB - Plan assessment cycle run

KSS4 - Plan cost splitting

KSPI - Plan Price Calculation

After all the above steps, Activity prices gets upadted in KP26.

Now the issue is, I expect, for all periods, the price should be same BUT it is coming out different. For one of the activity it comes out be correct and for others it is wrong.

What can be the reasons for this....?

Regards

Neeraj

Accepted Solutions (1)

Accepted Solutions (1)

ajaycwa1981
Active Contributor
0 Kudos

Neeraj

Check your Plan version settings in OKEQ.. If you used Periodic price there, price will be different each period

If you use Avg Price - it will be same each month

br, Ajay M

neeraj_bhardwaj4
Contributor
0 Kudos

thanks Ajay...!!

In the the version we used, it is Periodic Price and the cost among periods is different resulting in different price every month.

Thanks others too for there helpful answers....

0 Kudos

Hello Experts,

I have the same issue, but the problem is in Price Unit: in some months it is 00001, in others its 00100. I tried to change it manually in KP26, but as soon as i run KSPI and post the results, Price Unit goes back to that strange distribution.

Any ideas how I can set Price Unit equally/homogeneous in all months?

Thank you.

KR

Vitalii

samiuddin83
Explorer
0 Kudos

Dear Ajay,

I have Similar issue and Plan version settings in OKEQ. We have Set it as Avg Price.

Could you please advice.

Regards

Sam

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Neeraj

Where exactly you are facing problem? KSPI will be based on total cost in KP06 by Activity unit in KP26. Pls check activity unit in KP26.

Regards

Srinivas Salpala

neeraj_bhardwaj4
Contributor
0 Kudos

Hi Srinivas

Many thanks for your reply.

Activity unit or Planned quanitity...?

Regards

Neeraj

Former Member
0 Kudos

Hi,

Its planned quantity. In case of splitting structure, pls check the assigned cost elements against that particular activity type. Also, check the total cost of those cost elements in KP06 and activity qty in KP26.

After that run the KSPI once and check the result in KP26. Pls check all the values in which period you are getting differently.

Regards

Srinivas Salpala

Former Member
0 Kudos

Check the total cost in KP06 and total quantity in KP26 then execute plan cost splitting (KSS4) and plan activity price calculation (KSPI).

Check and let me know.

Regards,

Ravi.

Former Member
0 Kudos

In KSPI please check cost component split cost center/activity type combination, it will show the total cost which is considering for activity price calculation.

And also in kp06 check the cost element wise cosy.

If you are using splitting structure check all the cost elements were maintained in  splitting structure or not.

Regards,

Ravi.

neeraj_bhardwaj4
Contributor
0 Kudos

Hi Ravi

We are using splitting structure, where all production cost centers have been assigned. Also one cost element group has been assigned where all the assessment cost elements have been defined.

Regards

Neeraj Bhardwaj