Reduction - scheduling parameters

164 Views

Dear all,

I have defined a maximum reduction time in the scheduling parameters.
Operations -> Scheduling -> Define Production Order Scheduling Parameters.

I left "0 Do not reduce" so that I will define the reduction at the production order level.

I have also defined the reduction strategies in Customizing for Shop Floor Control by choosing
Operations -> Scheduling -> Define Reduction Strategies.

What I was expecting from this definition is that the following 3 values will be reduced to the % of reduction defined in both parametres.

Queue time

Move time

Floating time before and after production

In my production order there is no difference between a reduced and non-reduced scheduling. Is there something I missed in the setting?

Thanks in advance