PM Order - Change "Work Center" on operations to "Main Work Center"

ankur_sharma10
Explorer
0 Kudos

Hi Experts,

We have prepared a tool for client, which create Maintenance Plan and order in the background.

The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.

Client has the requirement that work center maintained at operations should be same as the main work center.

We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.

Has anyone worked on the similar requirement before?

I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.

Please suggest any possible solution.

Thanks,

Ankur Sharma

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Ankur,

Only put the Main Work Center in the header of the order, system automatically will take that work center as an operational work Center. No need to enter operation work center at Operation tab.

--

Regards;

TRB

ankur_sharma10
Explorer
0 Kudos

Hi Tilak,

Thanks for the response. The current situation is that we are creating the order in background using the Z-program. The scenario is creating order with operation entries having work center not equal to the main work center.

I am not functional, so just talking in terms of technical terms.

Is there a way the work center at operation level can be changed to main work center in background?

Thanks,

Ankur Sharma