Reservation for Maintenance Order against many WBS.

Former Member
0 Kudos

Sir / Madam,

I want to make reservation through Maintenance Order.

As per our scenario all material are being considered as project stock

& stocked at different WBS level.

When I am doing reservation through Maintenance Order Component Tab,

reservation getting generated for only one WBS. (This is applicable

only after assigning WBS element in Additional Data tab of Maintenance

Order and selecting "2 = Project Stock" component tab.)

Requirement is that we want to make reservation against different WBS,

through maintenance order.

Please suggest how to do it?

Regards.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Assign the WBS in equipment master. Activate the Object list entries to operations in IMG config Define Notification & Order Integration & assign the components for the operations. Then check the same.

I have not tried this. Please check.

Regards,