cancel
Showing results for 
Search instead for 
Did you mean: 

Paused the recurrence

Former Member
0 Kudos

Hello,

I need to pause some of the reports at once, can I do that in BO? I mean I need to pause the reports in one folder, how can we do thtat?

Accepted Solutions (0)

Answers (2)

Answers (2)

0 Kudos

Moved to BOE Admin forum, possibly someone there may have a way to accomplish this.

former_member292966
Active Contributor
0 Kudos

Hi,

When you say pause, does this mean you have reports schedule in BO Enterprise? If yes then you can go into the history of the report and pause the scheduled instance.

Good luck,

Brian

Former Member
0 Kudos

I know that, I need to do folder wise, not report basis.

Former Member
0 Kudos

i believe the scheduler is on a report by report basis, dont think you can do it on the folder level