on 01-30-2008 1:56 AM
Hi All
How to Reverse the scrap quantity from QI stock to production order instead of cost center.
General Reversing will take place using T.code MB1A and Movement type 555. while doing this
we have to give proper cost center instead of that I want to post it to production order is
it possible.
Hi,
I think you wish to use the BOM component by bringing it back in unrestricted stock.
Please note that whe you scrap a material you do it for a header material. If you scrap the same as a heaer material remember you do not have trace of its stock now, or you have it in QA which shall subsequently leave the trace in system.
Now you have physical scrap without trace of stock in system
In this case you can use MB1C 532 to bring the scrap in stock as scrap and use the same in production.
Narendra LOHOKARE.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Why you want to do?
If you are scrapping means you cannot use for further
If you want to use for production ,you have to create rework order?
If you give more detail,.........
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
96 | |
9 | |
8 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.