cancel
Showing results for 
Search instead for 
Did you mean: 

PP/QM

Former Member
0 Kudos

Hi,

Can anybody give me master data template for PP & QM

my mail ID is [email id removed]

Regards,

Abhay

Message was edited by:

Somnath Manna

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

can anybody help me out regarding above query?

Regards,

Abhay

Former Member
0 Kudos

Hi Abhay,

Check your mailbox.I have sent you template.Pl. reward suitable point.

Regards,

Shailendra

Former Member
0 Kudos

Sir,

I am looking for master data template for PP & QM ( which master data is required for PP & QM )

Regards,

Abhay

Former Member
0 Kudos

Hi Abhay,

That is std, template.

For further explaination pl.check your mailbox.

Regards,

Shailendra

Former Member
0 Kudos

Hi Abhijit,

Have you received the document?

Regards,

Shailendra

Former Member
0 Kudos

Hi Abhay,

Pl. reward suitable point.You havn't rewarded any point.

Regards,

Shailendra

Former Member
0 Kudos

Hi,

Classification Class type, class and characteristics

MRP1 MRP type, MRP controller, lot type and MRP group

MRP 2 Procurement type, special procurement type, batch entry, production storage location, backflush, in-house production time, planned delivery time, GR processing time and schedule margin key

MRP 3 Strategy group and availability check

MRP 4 Selection method for BOM & routing and individual/collective requirements

Work Scheduling Production scheduler, production scheduling profile, batch record required and batch management

SAP Material master views with field name details

View Field Description Remarks

Plant Organizational Element identifies the data relevant for that plant

Storage Location Organizational Element identifies the data relevant for storage location within a plant

Basic Data Material Description Material Description

Base Unit of Measure Base Unit of Measure

Material Group Groups materials

Old material number Old material number

Division Determines Sales & business area

GenItem Cat Group grouping that helps the system to determine item categories during sales document processing

Volume Unit Unit referring to the volume of the material

MRP 1 ABC indicator Indicator that classifies a material as an A, B, or C part according to its consumption value. This classification process is known as the ABC analysis

MRP Type Key that determines whether and how the material is planned

Reorder point If the stock falls below this quantity, the system flags the material for requirements planning.

MRP Controller Specifies the number of the MRP controller or group of MRP controllers responsible for material planning for the material.

Lot Size Key that determines which lot-sizing procedure the system uses within materials planning to calculate the quantity to be procured or produced. For Eg: lot for lot order quantity, fixed lot etc

Minimum Lot Size Depends on lot size indicator

Maximum Lot Size Depends on lot size indicator

MRP 2 Procurement Type Indicator that defines how the material is procured. The following procurements types are possible: The material is produced in-house. The material is procured Externally. The material can be both produced in-house/externally

Special Procurement Defines the procurement type more exactly. The system determines the procurement type from the material type

Quota arrangement usage Controls how the total order quantity is calculated in the quota arrangement, and thus which source of supply is determined for the material at a particular point in time.

Batch Entry Defines when batches have to be determined when using the PP/WM interface

Schedule Margin Key Key that the system uses to determine the floats required for scheduling an order. Opening period float after production (only in the case of in-house production) float before production (only in the case of in-house production) release period (only in the case of production order management)

Planned delivery time Number of calendar days needed to obtain the material or service if it is procured externally

Safety stock Specifies the quantity whose purpose is to satisfy unexpectedly high demand in the coverage period. The risk of shortfalls is reduced by having a safety stock. This has to be maintained for each plant.

Min safety stock The quantity that defines the lower limit for safety stock. This value cannot be exceeded.

MRP 3 Strategy Group The strategy group groups all the planning strategies that can be used for a particular material. It will decide the stock type production eg Make to Stock, Make to Order

Period indicator Unit of Period eg M, D, W.

Total Replenishment lead time The total replenishment lead time is the time needed before the product is completely available again

Availability Check

MRP 4 Selection method Selection of BOM at the time of MRP run.

Individual /coll. Indicator determining whether the following requirements are allowed for the dependent requirements of the material

Work Scheduling WS view to be maintained for in-house made components

Production Scheduler Person responsible for Production scheduling

Production Scheduling Profile It determines creation and release an order at the same time, or release an order and print the shop papers

Plant data storage2 Negative Stock in plant Indicator to keep negative stocks in the plant. This helps in creation of delivery in case production order is not confirmed in the system but physically the material is produced. Can be maintained for finished products.

Quality Management Inspection interval Specifies the interval between two quality inspections.

Inspection Set up This button is be used to activate inspection types in QM. It is used to initiate inspection at various stages of the logistics cycle. E.g. incoming inspection, in process inspection

QM Procurement Active This key is used to initiate Quality in Procurement activities. By activating this indicator Quality info records are created in Mm as a Master data. QM info record is created for a vendor material combination and is used for quality checks on the vendor. This may be used based on the requirements.

QM control key This key determines which conditions are valid for quality management in procurement. Once QM in procurement is activated this key has to be maintained. It is used for control over the vendor at the time of GRN.

Documentation Required Causes changes to inspection lots for this material to be documented by the system.

Certificate type Defines the content of the quality certificate .At GRN stage the system asks you whether a certificate has been received or not.

Regards,

Shailendra

Former Member
0 Kudos

Hi Shilendra,

Can u send the documents to pranavpp1@gmail.com

Thanks & Regards,

Pranav

Answers (0)