hi Friends,

Can any one tell me how can i maintain or use different units of measure at operation level.

For ex:

op 10 unit will in lb

op 20 unit will be in kg

op 30 unit will be in PC....

like wise.How to do the settings and where?

regards

Ramesh

Accepted Solutions (0)

Answers (7)

Answers (7)

siddheshwar_rajguru2
Active Participant
0 Kudos

Hi,

Go MM02 ---> Additioanl unit ---> maintain additinal UOM

like 1000kg=1 ton

u have to give conversion factor for each and mainatin as per ur requirement.

Regds

Siddhesh

Former Member
0 Kudos

HI Ramesh,

operaion is for perfomance done by work center, it can be HR, KW, PC which you have given in the workcenter.

Thanks

Bala

Former Member
0 Kudos

Hi Ramesh

In the operation detail screen u can maintain the operation unit . U have to give the conversion factor to the header unit ( which should be the base unit of the material to which the routing is attached) in the same screen.

regards

Prasad

Former Member
0 Kudos

Hi Ramesh,

To maintain the alternative unit of measure at operation level,

1. Goto routing operation overview

2. Select the operation you want to maintain alternative unit of measure

3. Goto details operation, operation detail screen will appear

4. Under the standard value section you can find the unit of measure conversion.

5. there you can maintain the conversion details.

If useful reward me with points..

Thanks

Venkat

Former Member
0 Kudos

Hi,

Do u want different UOM for components??

For component in material master --> additional data u can enter number of alternative UOM, Here give the relation between base UOM.

In BOM u can enter which is required.

In different operations u can assign as per required qty.

Regards,

Suhas

Former Member
0 Kudos

Hi

Check

SAP net weaver -


General setting--


Check Units of Measure--


Units of Measure

Here u can create new unit of measure

Former Member
0 Kudos

Hi

Check in operation details screen.under standard values tab.

Gopi