on 07-18-2017 11:14 PM
Dear experts,
Could someone help me please?
I'm struggling with controls transport.
Indeed, I have to transport only controls from an environment to another without control sets and contol assignments.
The version of BPC is 10.1 NW.
The transaction that I used is RAS1 for the transport, and the only object linked to controls that I can check to transport is the object "Controls". But when I do that, the whole objects linked to controls are transported (Controls+ Control sets+ Control assignments)
Many thanks in advance.
Regards,
Othmane
User | Count |
---|---|
13 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.