Change of Maintenance package in Task List

Hi,

Is it required to restart a maintenance plan when we have changed the maintenance package of a task list assigned to that maintenance plan?

Regards,

Nazarene

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Posted on Mar 16, 2017 at 09:05 AM

    Through experience I have always gone to IP10 after changing a strategy based plan to check that the sequence is correct.

    Also se this: https://archive.sap.com/discussions/thread/3534724

    PeteA

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Pete,

      Thanks for your reply. My question relates to changing specifically of Maintenance Packages on task list only, not the change of maintenance strategies.

      I have simulated to change the maintenance package from a task list, eg. 1000kms to 5000kms within the strategy, but when I try to use IP11U, nothing was selected for an update.

      Regards,

      Nazarene

  • Posted on Mar 24, 2017 at 05:33 AM

    Hi Nazarene,

    It is required to start scheduled maintenance plan whenever any changes done in maintenance package of a task list.

    Find below link for reference

    https://help.sap.com/saphelp_erp60_sp/helpdata/en/c8/10539a639a443ebaedf0f524ed1aed/content.htm

    PS R

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 10, 2017 at 01:44 AM

    Can anyone help out in this case if for example you have 900 plans connected to a task list, how do you restart those plans?

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 10, 2017 at 11:55 AM
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 05 at 06:12 AM

    Hi,
    Have you resolved you issue ?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.