Hello Experts,

Scenario: The manufacturing process has 2 Packing operations, one for Vacuum Packing the product and another for packing into sleeves and corrugated boxes. These two operations do not happen on the same day. The final GR happens only after the confirmation of the Manual packing process i.e. Packing Operation two.

Also the product has a short Shelf life (3-7 days) so every day counts.

Is there a way to capture the confirmation date of the Vacuum Packing step i.e. Packing Operation one and pass it as the DoM to the batch master record?