Skip to Content

Reverse Logistics MM

In normal sales process: material move from Plant (main warehouse in California) to DC (Chicago), DC to sub DC (Singapore), sub DC to customer (India)

Have you encounter a situation for reverse logistics (return of repaired parts) where incoming back parts need to move back to the main warehouse but without showing the dc and without showing the reverse cost for the valuated the equipment. How do I go about designing a solution for this problem?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on 3 days ago

    Sending your own valuated material for repair and returning back- you have repair cost and delivery charge associated!

    Check subcontract process of sending same material and receiving that same material is helpful from vendor else check May helpful

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.